Drive migration execution (7.5TB physical move)
Consolidation + Scale Prep (September – October) high priority
low confidence
Why
Distinct from designer workflow change. Bandwidth-bound (~7.5TB transfer). Large window for retries + verify.
How
- Sync Drive → target storage in batches
- Verify checksums
- Switch read paths