Egypt-direct architecture spike

Foundation (May (week 2 – 4)) critical priority low confidence

Why

Largest greenfield effort of August. Two-path design (NC-cut vs NC-in-the-loop) until Terry answers.

How

  • Order-state machine model (which states trigger Egypt push)
  • In-app queue surface for Egypt team
  • English-only UI primitives (drop-downs, fabric icons, picto cues)
  • Hasura role for Egypt with strict column coverage
  • Two-path PR scaffolding (toggle between NC-in vs NC-cut)

Blocked By

  • Terry approval — cut NC — Gates entire Egypt-direct architecture. Until known, design must support both paths (NC-in fallback adds lag). (Owner: Mat)
OwnerJackson
PhaseFoundation
WindowMay (week 2 – 4)
Dev days4d
Calendar days~10d
Confidencelow
Prioritycritical